Technical Specs
CLASS | Motor Yachts |
BUILDER | Sunseeker |
BUILT/REFIT | 2005/2026 |
LENGHT | 23.09 m |
BEAM | 5.64 m |
DRAFT | 1.68 m |
CABIN | 4 |
1. Main Engine Starboard and Portside (MAN D2842LE409)
Engine Details:
MODEL: MAN D2842LE409
Serial Number 1 (Portside): 7010667160
Serial Number 2 (Starboard): 7010667161
General Scope: 5,000-hour maintenance with replacement of faulty control units and analog engine display units (cabin, flybridge). One starboard engine display unit is inoperative (replacement). Test the entire alarm system, main engine control unit (left/right).
Periodic Maintenance Tasks:
Oil change
Fuel filter replacement
Chassis fuel filter replacement
Oil filter replacement
Fuel separator filter replacement
Air filter replacement
V-belt replacement
Zinc anode replacement
Impeller replacement
Coolant replacement
Crankcase filter replacement or cleaning
Workshop & Heavy Maintenance Tasks:
Complete disassembly of marine water pumps and replacement of the repair kit in the workshop.
Complete disassembly of freshwater pumps and replacement of the repair kit in the workshop.
Cylinder head removal and resurfacing. Valve and valve guide replacement.
Valve adjustment.
Fuel pump and injector removal and reassembly in the workshop.
Removing and chemically cleaning the intercoolers in the workshop, replacing the necessary O-rings, gaskets, and bolts. Conducting pressure tests.
Removing 8 turbines and sending them to the workshop.
Testing the turbine housing for leaks (oil seals).
Removing and chemically cleaning the seawater coolers in the workshop, checking the sealing plates.
Removing and repairing two starters and two generators.
Replacing thermostats.
After removing the cylinder head, measure the piston height, check the cylinder ovality, and compile a report.
Removing the oil coolers and replacing the gaskets.
2. Additional Work on the Main Engine
Replacement of crankcase gaskets (2 pcs).
Eliminate fuel and lubricant contamination from entering the diesel generator exhaust system (during operation, oil stains appear outside the DG-1 and DG-2 engines - reasons unknown).
3. Diesel Generator Maintenance (DG-1 & DG-2)
Routine Maintenance Tasks:
Oil change
Oil filter change
Fuel filter change
Fuel separator filter change
Crankcase ventilation filter change
Zinc anode replacement
Coolant change
V-belt replacement
Workshop & Repair Tasks:
Remove cylinder heads and send them for resurfacing.
Remove turbines and send them to a workshop.
Test turbine casings (oil seals) for leaks.
Remove marine water pumps and replace repair kits.
Removing the seawater coolers and chemically cleaning them in the workshop, replacing the necessary O-rings, gaskets, and bolts.
Removing the freshwater pump and replacing the repair kit.
Removing the generators and sending them to the workshop for maintenance.
Removing the starters and sending them to the workshop for maintenance.
4. Additional Diesel Generator Costs & Materials
Exhaust Elbow Replacement (2 pcs)
Inlet Valve Oil Seal (6 pcs)
Exhaust Valve Oil Seal (6 pcs)
Seawater Intake Sensor (2 pcs)
Valve Oil Seals (12 pcs)
O-Ring (6 pcs)
Full Casing Insulation
Stainless Steel Lower Engine Mount Tray (Inox)
2" (51 mm) Exhaust Hoses
1" (25 mm) Seawater Hoses
Clamps
Corroded Sheets and Pipes: Welded and Static Painted
5. Alternator Servicing (Starboard and Port)
Dismantling the generator rotor and stator.
Cleaning in the workshop using an electric cleaner.
Taking measurements of diodes and other electronic boards.
Cleaning the generators and performing insulation tests.
Installing the generators and connecting cables.
Testing and commissioning.
6. Exhaust Pipe Gasket Replacement
Removing the exhaust pipes from the vessel.
Lowering the pipes from the vessel and cleaning them.
Replacing the gaskets.
Removing the exhaust pipe cooling casing and cleaning it.
Replacing the bolts with new ones.
7. Main Engine Exhaust Elbows
Removing the cooling elbows of the main engine exhaust system and replacing them with bronze elbows.
8. Main Engine Exhaust Insulation
Replacing the exhaust gas insulation of the main engine.
9. Propellers
Dismantling / Installation
Delivery to the workshop for inspection (including transportation costs)
Flaw detection
Propeller balancing
Polishing
10. Propeller Shafts
Dismantling / Assembly
Delivery to the workshop for inspection (including transportation costs)
Flaw detection
Runout testing
Shaft cleaning
11. Steering (Rudder Stock)
Removal / Installation
12. Shaft Bushings
Removing old bushings
Installing new bushings
13. Driveshaft Materials and Labor
Universal joint 72*185 (Original)
Universal joint maintenance
Shaft repair, maintenance, and balancing
Fabrication of a broken shaft seal
14. Steering System Materials and Labor
Steering system sealing ring
Manufacturing of steering shaft bearings
Manufacturing of steering wheel couplings
15. Hydraulic Steering Hoses
Replacing stainless steel hydraulic steering hoses
16. Shaft Support Bracket
Shaft support bracket bearing adjustment and in-situ machining (IN-SITU)
17. Vibration Analysis & Laser Measurement: Shaft Line
Inspection and report on the vibration analysis of the main engine, transmission, and structure (before and after).
18. Vibration Analysis & Laser Measurement: Propeller Shaft Line
Inspection and report on laser measurement of the propeller shafts to the engine.
19. Vibration Analysis & Laser Measurement: Propeller Shaft Alignment
Inspection and report on the laser inspection of the propeller shaft bearing axis.
20. Bow Thruster / Steering Unit Repair
Electric Motor: Disassembly, bearing replacement, sandblasting, painting, and workshop testing.
Screws/Propeller: Screw removal, fabrication of new zinc anodes.
Gearbox: Gearbox disassembly, seal replacement, bearing replacement, shaft inspection, and gearbox oil change.





















